| DIRECT COST of OPERATION |
COST / HOUR
|
|
CONSUMABLES |
|
|
|
Fuel - 10.5 gph @ $3.68 gallon |
$38.64
|
|
|
Oil / Hour |
$0.70
|
|
SCHEDULED MAINTENANCE
Includes labor for required periodic airframe
inspection, overhauls, engine removal and replacement, etc. |
|
|
|
Labor Cost = 0.36 M/H per F/H X $55.00/HR |
$19.80
|
|
UNSCHEDULED
MAINTENANCE |
|
|
|
Labor Cost = 0.06 M/H per F/H X $55.00/HR |
$3.30
|
 |
| |
|
SUBTOTAL DIRECT COST OF OPERATION: |
$62.44
|
| RESERVES |
|
| |
RESERVE FOR
ENGINE OVERHAUL |
$10.80
|
| |
RESERVE FOR
SPARE PARTS |
|
| |
|
Unscheduled Replacement and
On-Condition Parts |
$4.70
|
| |
|
Scheduled Maintenance/Inspection
Materials |
$.81
|
| |
|
Major Component Overhaul @
TBO
Replacement of Retirement Item |
$11.83
|
 |
| |
|
SUBTOTAL RESERVES: |
$28.14
|
 |
| |
|
TOTAL DIRECT OPERATING COST: |
$90.58
|
 |
 |
Based on 5 Years at 1000 hours
per year (5000 hours)
Labor and Fuel Cost are Typical for US Operations |