| DIRECT COST of OPERATION |
COST / HOUR
|
|
CONSUMABLES |
|
|
|
Fuel - 23.0 gph @ $3.25 gallon |
$74.75
|
|
|
Oil @ 3% of fuel cost |
$2.24
|
|
SCHEDULED MAINTENANCE
Includes labor for required periodic airframe
inspection, overhauls, engine removal and replacement, etc. |
|
|
|
Labor Cost = 0.43 M/H per F/H X $55.00/HR |
$17.05
|
|
UNSCHEDULED MAINTENANCE |
|
|
|
Labor Cost = 0.12 M/H per F/H X $55.00/HR |
$6.60
|
 |
| |
|
SUBTOTAL DIRECT COST OF OPERATION: |
$100.64
|
| RESERVES |
|
| |
RESERVE FOR ENGINE AND ACCESSORIES
OVERHAUL |
$54.53
|
| |
RESERVE FOR SPARE PARTS |
|
| |
|
Unscheduled Replacement and On-Condition Parts |
$5.81
|
| |
|
Scheduled Maintenance/inspection materials |
$2.07
|
| |
|
Major Component Overhaul @ TBO
Replacement of Retirement Item |
$15.49
|
 |
| |
|
SUBTOTAL RESERVES: |
$77.90
|
 |
| |
|
TOTAL DIRECT OPERATING COST: |
$178.54
|
 |
 |
Based on 5 Years at 1000 hours
per year (5000 hours)
Labor and Fuel Cost are Typical for US Operations |